If you sit on a condo board in Florida, own a unit in an aging high-rise, or manage residential property along the coast, chances are you’ve heard the term “recertification” thrown around more often in the past few years than ever before. New laws passed in the wake of the Champlain Towers South collapse in Surfside have transformed what used to be a routine paperwork exercise into one of the most important safety and financial decisions a building can make. Understanding the process — and choosing the right engineering partner to guide you through it — can mean the difference between a smooth compliance process and a costly, drawn-out ordeal.
Why the Rules Changed
Before 2021, structural safety requirements for older condos varied by county, and enforcement was inconsistent. After the Surfside tragedy, Florida lawmakers passed sweeping legislation requiring statewide milestone inspections for buildings three stories or taller once they reach 30 years of age (25 years if within three miles of the coast), with recurring inspections every 10 years after that. Alongside these inspections, associations must now also complete Structural Integrity Reserve Studies (SIRS) and fund reserves for major structural components rather than waiting until a problem becomes an emergency.
For boards, this means recertification is no longer just a box to check it’s a legal obligation with real financial planning implications for every unit owner.
What a Milestone Inspection Actually Involves
A milestone inspection is conducted in two phases. Phase One is a visual assessment of the building’s structural and life-safety systems, looking for signs of distress such as cracking, spalling concrete, corrosion, or water intrusion. If the inspecting engineer finds substantial structural deterioration, a Phase Two inspection follows, involving more invasive testing to determine the extent of the damage and what repairs are required.
This is precisely the kind of work G. Batista Engineering & Construction specializes in. Led by Greg Batista, PE, CGC, SI an engineer with direct, on-the-ground experience from disaster response efforts including the Surfside collapse itself — the firm brings a level of firsthand insight into structural failure that few local competitors can match.
Reserve Studies: The Financial Side of Safety
Milestone inspections tell you what’s wrong with a building today. Structural Integrity Reserve Studies tell you how much money needs to be set aside to fix it — and to prevent future problems — over the coming decades. Florida law now requires associations to conduct a SIRS at least every 10 years and to fully fund reserves for the structural components it covers, eliminating the option to waive or underfund these reserves the way many associations once did.
For boards, this often means recalculating budgets, adjusting assessments, and having difficult conversations with unit owners about rising costs. Having an engineering firm that can walk through the numbers clearly, explain the “why” behind every line item, and prioritize repairs by urgency makes that conversation significantly easier.
Choosing the Right Engineering Partner
Not every structural engineering firm is equally equipped to handle Florida’s recertification requirements. Boards should look for a few key qualifications:
- Licensed, Florida-based engineers who understand local building codes, wind load requirements, and coastal corrosion factors
- Direct construction experience, not just inspection reports — someone who can also scope and price the actual repair work
- A track record with milestone inspections and SIRS specifically, not just general engineering
- Clear, board-friendly communication, since much of this work needs to be explained to non-technical unit owners at association meetings
- Batista Engineering & Construction checks each of these boxes, offering milestone inspections, SIRS, concrete repair, owner’s representative services, and structural plans under one roof — serving Miami-Dade, Broward, and Palm Beach counties from Miami to West Palm Beach.
Don’t Wait for a Violation Notice
Buildings that miss recertification deadlines can face fines, insurance complications, and in some cases forced evacuation until compliance is achieved. The safest approach for any board is to get ahead of the deadline, schedule an inspection early, and work with an engineer who can flag potential issues before they become legal or financial emergencies.
Recertification isn’t just a regulatory hurdle — it’s an opportunity to catch problems while they’re still manageable and to give unit owners confidence that thei
